Clarence Valley Council are replacing the current timber bridge with a new concrete one using InQuik’s pre-assembled bridge system, which means a much faster upgrade.
Benefits of the upgrade:
- The new bridge will cost less to maintain and will be bushfire resilient
- Road users will no longer have to stop or give way to oncoming traffic at the bridge
- Two lanes will improve the travel efficiency and safety for everyone.
Read the article via the link below.
https://www.clarence.nsw.gov.au/cp_themes/metro/page.asp?p=DOC-GQD-61-54-36